| Laid down | 7th November 1940 |
| Launched | N/A |
| Completed | N/A |
| Commissioned | N/A |
| Fate | Scrapped: 1943 |
| Builders | Kure Navy Yard, Kure Japan |
| Complement | 2500 |
| Dimensions | |
|---|---|
| Displacement | 63000 tons std 71659 tons max |
| Dimensions | 862' 6" x 121' |
| Draught | 34' |
| Armament | |
| Main guns | 9 x 18.1" (3 x 3) |
| Secondary guns | 12 x 6.1" (4 x 3) |
| Torpedo tubes | None |
| Other weapons | 12 x 5" (6 x 2) 24 x 25mm 4 x 13.2mm |
| Countermeasures | None |
| Armour | Belt: 3" - 16.1" Deck: 1.3" - 7.8" Barbettes: 2" - 21" Turrets: 15" - 25" |
| Aircraft Facilities | |
| Aircraft | 5 x seaplanes |
| Flightdeck | None |
| Hangar | N/A |
| Catapults | 2 |
| Arrestor system | None |
| Aviation fuel | N/A |
| Electronics Fit | |
| Radar | Type 21 |
| Sonar | N/A |
| ECM | None |
| Other | N/A |
| Machinery | |
| Engines | 12 x Kampon boilers 4 x Kampon steam turbines |
| Power output | 150000shp |
| Speed | 27kts |
| Shafts | 4 |
| Range | N/A |
| Fuel | N/A |
Work on Project 111 was suspended in December 1940 and the ship was cancelled in 1942.
Last altered : 15th June 1999
|
Back |