[ Main ] [ Russian Navy ] [ Russian SSBN ]
[ Data ] [ History & Modifications ] [ Pictures ]

Project 658 Class



Name Builders Laid down Launched Commissioned
K16 S N/A N/A 15th June 1963
K19 S 17th October 1958 8th August 1959 12th November 1960
K33 S N/A N/A 6th June 1961
K40 S N/A N/A 28th December 1962
K55 S N/A N/A 12th August 1962
K145 S N/A N/A 19th December 1963
K149 Ukrainsky Komsomolets S N/A N/A 12th February 1964
K178 S N/A N/A 30th June 1964


Builders:
S : Sevmashpredpriatie, Severodvinsk, Russia

Dimensions:
377' 2" x 28' 2" x 25' / 114.10m x 9.20m x 7.31m

Displacement:
4030 tons surfaced / 5000 tons dived

Complement:
128

Armament:
4 x 21" bow torpedo tubes
2 x 18" stern torpedo tubes

A maximum of 12 torpedoes can be carried, either SET-65 or 53-65K models.

Three R13 / SS-N-4 Sark SLBM were carried in fin mounted launch tubes.

Powerplant:
Two VM-A pressurized water reactors totaling 140MW are carried, along with two 60-DM steam turbines producing a total of 39200shp and driving two shafts. Maximum range was 31000NM @ 26kts and endurance was 50 days.

Maximum speed is 21kts surfaced and 26kts submerged.

Electronics Fit:
Radar:
N/A

Sonar:
MG-200 Arktika
MG-10

Other:
Nakat ESM
Khrom-K IFF
Pluton navigation

Miscellaneous:
Maximum diving depth is 984'.