| www.pmay.com/opc.htm | ||||||||||||||||||
|
||||||||||||||||||
|
Workload Scheduler for z/OS TWSzOS - OPC Operations Planning and Control |
||||||||||||||||||
|
T ivoli Workload Scheduler for z/OS is the new name for Operation Planning and Control , popularly known as OPC. It is IBM/Tivoli's strategic tool for scheduling and controlling work in the Enterprise. |
||||||||||||||||||
|
|
|
|||||||||||||||||
|
|
Questions or problems?Post them on the IBM/Tivoli PACO ( Performance, Availability, Configuration, and Operations) Forum at http://www-106.ibm.com/developerworks/forums/tivoli_forums.jsp. Prefix the title of all TWSzOS related posts with TWSzOS. Free registration is required to post. |
|||||||||||||||||
|
|
The TWS z/OS v8.3 manuals are available to read on the web as are TWS z/OS v8.2 , as are the TWS z/OS v8.1and OPC V2.3 manuals. |
|||||||||||||||||
|
|
User Groups are another useful source of information. I maintain a list of user groups, with information on past and future meetings. |
|||||||||||||||||
|
|
If you have any questions please contact me at peter@pmay.com |
|||||||||||||||||
peter@pmay.com 26 January 2010
|
||||||||||||||||||